house-extension.uk

Bedroom extensions for homes in Yate

From the first sketch to final sign-off, we plan and build bedroom extensions in Yate and the surrounding Gloucestershire area.

  • Guide price in YateFrom £26,500 inc VAT
  • PlanningUsually a householder application
  • Build time14–22 weeks on site
  • Postcode districtsBS37
Bedroom in an extension with a roof window and an en-suite shower room

Local to Yate

Postcode districts we cover around Yate include BS37. We also work in nearby Mangotsfield (5 miles), Thornbury (7 miles), Kingswood (7 miles), Dursley (11 miles).

For homes towards Somerset, Keynsham is around 9 miles away. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.

What is included

  • Structure, roof, insulation and finish
  • Planning drawings and application
  • Fire safety: escape windows and smoke alarms to building regulations
  • Heating extended to the new rooms

Planning and approvals in Yate

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Bedroom extension prices in Yate

Labour and material costs vary across the UK, so for Yate we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Yate: £1,630 to £3,260 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
One bedroom
12 m²
£26,500 – £32,500£26,500 – £34,500£29,000 – £39,500
Bedroom and en-suite
18 m²
£29,000 – £36,000£34,500 – £45,000£44,000 – £59,000
Two rooms
30 m²
£48,500 – £60,000£58,000 – £75,000£73,000 – £98,000

Want a range for your exact size? The guide-price tool takes about a minute.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Yate home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Your questions about a bedroom extension in Yate

How long does a bedroom extension take to build in Yate?

On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Who do I contract with for a bedroom extension in Yate?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours in Yate be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Will a new bedroom need planning permission?

Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.

Does an en-suite need a window?

No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.

Book a free site visit in Yate

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote