house-extension.uk

Side return extensions for homes in Yate

From the first sketch to final sign-off, we plan and build side return extensions in Yate and the surrounding Gloucestershire area.

  • Guide price in YateFrom £18,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsBS37
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

What we take care of

  • Kitchen-ready shell or full finish
  • New boundary wall or raised party wall
  • Glazed, sloping or flat roof with rooflights
  • Party wall notice support (England and Wales)
  • Survey of the outrigger, boundary wall and drainage

Planning and approvals in Yate

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Extensions in and around Yate

Across BS37, we can visit, measure and advise. Neighbouring towns we cover include Mangotsfield (5 miles), Thornbury (7 miles), Kingswood (7 miles), Dursley (11 miles).

Keynsham, in Somerset, is roughly 9 miles from Yate and also on our list. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.

How much does a side return extension cost in Yate?

Prices below are for Yate, using the South West England factor of ×1.02. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Yate: £2,140 to £3,880 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£18,000 – £22,000£19,500 – £24,500£24,000 – £31,500
2 m × 5.5 m
11 m²
£23,500 – £28,500£26,500 – £34,000£33,500 – £43,000
2.2 m × 7 m
15 m²
£32,000 – £38,500£36,500 – £46,000£45,500 – £58,500

Want a range for your exact size? The guide-price tool takes about a minute.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Side return extension questions answered

How long does a side return extension take to build in Yate?

On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Will my neighbours in Yate be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Yate, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Can I combine a side return with a rear extension?

Yes. That combination is a wraparound extension, which adds the most space to a terraced house.

How much does a side return extension cost?

Our guide range is about £2,140 to £3,880 per m² including VAT, so a typical 2 m × 5.5 m infill lands around £26,500 to £34,000 at standard spec in Yate, more in London.

Book a free site visit in Yate

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote