Single-storey rear extensions across Yate
We design and build single-storey extensions for houses in Yate, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in YateFrom £21,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsBS37

Planning and approvals in Yate
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What should I budget for a single-storey extension in Yate?
These guide figures apply our South West England adjustment (×1.02) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Yate: £1,780 to £3,470 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £21,000 – £25,500 | £25,000 – £32,000 | £31,500 – £42,000 |
| 4 m × 5 m 20 m² | £35,500 – £42,000 | £41,500 – £53,500 | £53,000 – £69,500 |
| 5 m × 6 m 30 m² | £53,500 – £63,000 | £62,500 – £80,000 | £79,500 – £104,500 |
Try the guide-price tool to see a range for your own size and finish.
Is a single-storey extension right for your house?
- Semi-detached and detached houses with a usable rear garden
- Terraced houses that want a deeper kitchen across the full width
- Homeowners who want open-plan living onto the garden
Working in Yate
Our survey diary covers Yate, including BS37. The same team covers Mangotsfield (5 miles), Thornbury (7 miles), Kingswood (7 miles), Dursley (11 miles), all within easy reach.
Just over the Somerset border, Keynsham is about 9 miles away. South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Yate home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about single-storey extensions
Do you cover all of Yate?
Yes. We cover Yate and the surrounding parts of Gloucestershire. Site visits are free and there is no obligation.
Who do I contract with for a single-storey extension in Yate?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Yate be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Will I need a steel beam?
Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Book a free site visit in Yate
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.