Our design and build teams take on bedroom extensions in Stroud, from the first measured survey through planning and building control to the finished room.
- Guide price in StroudFrom £26,500 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsGL5, GL6

What we take care of
- Layout options: two-storey, over-garage or ground floor
- Planning drawings and application
- Structure, roof, insulation and finish
- Fire safety: escape windows and smoke alarms to building regulations
- En-suite drainage and ventilation design
Bedroom extension prices in Stroud
Labour and material costs vary across the UK, so for Stroud we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Stroud: £1,630 to £3,260 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £26,500 – £32,500 | £26,500 – £34,500 | £29,000 – £39,500 |
| Bedroom and en-suite 18 m² | £29,000 – £36,000 | £34,500 – £45,000 | £44,000 – £59,000 |
| Two rooms 30 m² | £48,500 – £60,000 | £58,000 – £75,000 | £73,000 – £98,000 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Stroud
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Stroud
We cover Stroud and the postcode districts GL5, GL6. Neighbouring towns we cover include Dursley (8 miles), Gloucester (8 miles), Cirencester (10 miles), Cheltenham (12 miles).
In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about bedroom extensions
Will my neighbours in Stroud be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a bedroom extension in Stroud?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a bedroom extension take to build in Stroud?
On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
How much does a bedroom extension cost?
Our guide range is about £1,630 to £3,260 per m² including VAT. A bedroom with an en-suite of about 18 m² is typically £34,500 to £45,000 at standard spec, depending on whether it is part of a larger two-storey build.
Book a free site visit in Stroud
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .