Brough bedroom extensions, designed and built
Thinking about a bedroom extension for your Brough home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in BroughFrom £24,000 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsHU15

Guide prices for Brough
Labour and material costs vary across the UK, so for Brough we use our Yorkshire and the Humber factor (×0.94). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Brough: £1,500 to £3,010 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £24,000 – £30,000 | £24,000 – £32,000 | £27,000 – £36,500 |
| Bedroom and en-suite 18 m² | £27,000 – £33,000 | £32,000 – £41,500 | £40,500 – £54,500 |
| Two rooms 30 m² | £45,000 – £55,000 | £53,500 – £69,500 | £67,500 – £90,500 |
For a figure based on your own dimensions, use our guide-price tool.
What we take care of
- Fire safety: escape windows and smoke alarms to building regulations
- Layout options: two-storey, over-garage or ground floor
- Heating extended to the new rooms
- En-suite drainage and ventilation design
- Structure, roof, insulation and finish
Will the council need to approve it?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
The planning position for a specific Brough address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Brough
Our survey diary covers Brough, including HU15. The same team covers Hull (10 miles), Beverley (10 miles), Goole (13 miles), Bridlington (29 miles), all within easy reach.
Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a bedroom extension in Brough
Who do I contract with for a bedroom extension in Brough?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a bedroom extension take to build in Brough?
On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Brough, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Can I add a ground-floor bedroom for a relative?
Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Book a free site visit in Brough
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.