house-extension.uk

Wraparound extensions for homes in Brough

Our design and build teams take on wraparound extensions in Brough, from the first measured survey through planning and building control to the finished room.

  • Guide price in BroughFrom £33,500 inc VAT
  • PlanningUsually a householder application
  • Build time14–20 weeks on site
  • Postcode districtsHU15
L-shaped wraparound extension on a brick terraced house at dusk

Who a wraparound extension suits

  • Families who want kitchen, dining and living in one space
  • Semi-detached houses with a side passage
  • Terraced houses that want the largest ground floor possible

The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.

What should I budget for a wraparound extension in Brough?

For Brough we adjust our national guide rates by ×0.94, the factor we use for Yorkshire and the Humber. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Brough: £1,880 to £3,480 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Compact L-shape
18 m²
£33,500 – £41,000£38,500 – £49,500£49,000 – £63,000
Medium L-shape
25 m²
£47,000 – £56,500£54,000 – £68,500£68,000 – £87,000
Large L-shape
32 m²
£60,000 – £72,500£69,000 – £87,500£87,000 – £111,500

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Brough?

In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Extensions in and around Brough

We cover Brough and the postcode districts HU15. Nearby, we also take on projects in Hull (10 miles), Beverley (10 miles), Goole (13 miles), Bridlington (29 miles).

Scunthorpe, in Lincolnshire, is roughly 11 miles from Brough and also on our list. Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Wraparound extension questions answered

How long does a wraparound extension take to build in Brough?

On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Who do I contract with for a wraparound extension in Brough?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do I need building regulations approval in Brough?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will I need to move a drain?

Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.

Do wraparound extensions need planning permission?

Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.

Book a free site visit in Brough

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote