Radcliffe orangery extensions, designed and built
If you live in Radcliffe and want more space without moving, an orangery extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in RadcliffeFrom £28,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsM26, M45

Working in Radcliffe
Postcode districts we cover around Radcliffe include M26, M45. We also work in nearby Whitefield (1 mile), Prestwich (3 miles), Bury (3 miles), Farnworth (3 miles).
The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
Guide prices for Radcliffe
These guide figures apply our North West England adjustment (×0.95) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Radcliffe: £2,280 to £4,280 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £28,500 – £34,500 | £31,500 – £40,000 | £38,500 – £51,500 |
| 4 m × 4 m 16 m² | £36,000 – £44,500 | £42,500 – £53,500 | £51,500 – £68,500 |
| 4 m × 6 m 24 m² | £54,500 – £66,500 | £63,500 – £80,000 | £77,500 – £103,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Radcliffe
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Included in a typical project
- Heating sized for the glass area
- Design of piers, roof perimeter and lantern proportions
- Aluminium or timber lantern and full-height glazing
- Thermal calculations where glazing is generous
- Foundations, walls and insulated perimeter roof
- Opening into the main house
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Radcliffe
How long does an orangery extension take to build in Radcliffe?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Radcliffe, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Radcliffe?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
How much does an orangery cost?
Our guide range is about £2,280 to £4,280 per m² including VAT, so a 16 m² standard-spec orangery is typically £42,500 to £53,500 in Radcliffe.
Book a free site visit in Radcliffe
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end