Conservatory replacement extensions across Radcliffe
Planning a conservatory replacement in Radcliffe? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in RadcliffeFrom £19,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsM26, M45

What should I budget for a conservatory replacement in Radcliffe?
These guide figures apply our North West England adjustment (×0.95) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Radcliffe: £1,760 to £3,320 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 3.3 m 10 m² | £19,000 – £23,000 | £20,000 – £26,500 | £26,000 – £33,500 |
| 3.5 m × 4 m 14 m² | £24,500 – £29,500 | £28,500 – £37,000 | £36,500 – £47,000 |
| 4 m × 5 m 20 m² | £35,000 – £42,000 | £40,500 – £52,500 | £52,000 – £66,500 |
Includes removal of the old conservatory. Reusing existing foundations is only possible after investigation.
For a figure based on your own dimensions, use our guide-price tool.
Is a conservatory replacement right for your house?
- Conservatories that are too hot or too cold
- Older uPVC conservatories near the end of their life
- Homes where the conservatory sits unused
A replacement is a chance to rethink the shape. Many conservatories are oddly proportioned; for a similar cost the new room can often be squarer, wider or better connected to the kitchen.
Working in Radcliffe
We cover Radcliffe and the postcode districts M26, M45. The same team covers Whitefield (1 mile), Prestwich (3 miles), Bury (3 miles), Farnworth (3 miles), all within easy reach.
For homes towards Lancashire, Rawtenstall is around 10 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a conservatory replacement in Radcliffe
Do I need building regulations approval in Radcliffe?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Radcliffe be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Radcliffe?
Yes. We cover Radcliffe and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.
Can I keep the existing base?
Sometimes, but conservatory bases are often too shallow for solid walls. Trial holes tell us before we confirm the price.
Does replacing a conservatory need planning permission?
A solid replacement is treated as a new extension, so it must meet the permitted development limits or get planning permission, and it always needs building regulations approval.
Book a free site visit in Radcliffe
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.