Orangery extensions in Bury
Bury homeowners can use us for the whole orangery extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in BuryFrom £28,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsBL0, BL8, BL9, M26, OL10

Included in a typical project
- Thermal calculations where glazing is generous
- Heating sized for the glass area
- Design of piers, roof perimeter and lantern proportions
- Opening into the main house
- Aluminium or timber lantern and full-height glazing
- Foundations, walls and insulated perimeter roof
Working in Bury
We cover Bury and the postcode districts BL0, BL8, BL9, M26, OL10. The same team covers Radcliffe (3 miles), Heywood (3 miles), Whitefield (3 miles), Prestwich (5 miles), all within easy reach.
The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
How much does an orangery extension cost in Bury?
Prices below are for Bury, using the North West England factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Bury: £2,280 to £4,280 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £28,500 – £34,500 | £31,500 – £40,000 | £38,500 – £51,500 |
| 4 m × 4 m 16 m² | £36,000 – £44,500 | £42,500 – £53,500 | £51,500 – £68,500 |
| 4 m × 6 m 24 m² | £54,500 – £66,500 | £63,500 – £80,000 | £77,500 – £103,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Bury
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Bury
Who do I contract with for an orangery extension in Bury?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Bury be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Bury?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
How much does an orangery cost?
Our guide range is about £2,280 to £4,280 per m² including VAT, so a 16 m² standard-spec orangery is typically £42,500 to £53,500 in Bury.
Book a free site visit in Bury
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.