Orangery extensions across Devon
Thinking about an orangery extension for your Devon home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide priceFrom £30,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Towns covered9
- Site visitFree, no obligation

What we take care of
- Thermal calculations where glazing is generous
- Aluminium or timber lantern and full-height glazing
- Foundations, walls and insulated perimeter roof
- Heating sized for the glass area
The lantern-to-roof ratio sets the character. A wider solid perimeter gives a calmer, more room-like space and hides downlights and speakers; a bigger lantern feels brighter but needs more care against summer heat.
How much does an orangery extension cost in Devon?
Labour and material costs vary across the UK, so for Devon we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Devon: £2,450 to £4,590 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £30,500 – £37,000 | £34,000 – £43,000 | £41,500 – £55,500 |
| 4 m × 4 m 16 m² | £39,000 – £47,500 | £45,500 – £57,500 | £55,000 – £73,500 |
| 4 m × 6 m 24 m² | £58,500 – £71,000 | £68,500 – £86,000 | £83,000 – £110,500 |
For a figure based on your own dimensions, use our guide-price tool.
Extensions in and around Devon
Towns we cover in Devon include Plymouth, Exeter, Paignton, Torquay, Newton Abbot, Exmouth, Barnstaple, Bideford. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Do I need planning permission in Devon?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about orangery extensions
How long does an orangery extension take to build in Devon?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do you cover all of Devon?
Yes, across the whole of Devon. Site visits are free and there is no obligation.
Will my neighbours in Devon be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in Devon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.