Orangery extensions for homes in Somerset
A orangery extension in Somerset starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide priceFrom £30,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Towns covered11
- Site visitFree, no obligation

Towns in Somerset
Included in a typical project
- Aluminium or timber lantern and full-height glazing
- Thermal calculations where glazing is generous
- Design of piers, roof perimeter and lantern proportions
- Foundations, walls and insulated perimeter roof
Covering Somerset
Towns we cover in Somerset include Bath, Weston-super-Mare, Taunton, Yeovil, Bridgwater, Portishead, Frome, Burnham-on-Sea. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Guide prices for Somerset
Labour and material costs vary across the UK, so for Somerset we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Somerset: £2,450 to £4,590 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £30,500 – £37,000 | £34,000 – £43,000 | £41,500 – £55,500 |
| 4 m × 4 m 16 m² | £39,000 – £47,500 | £45,500 – £57,500 | £55,000 – £73,500 |
| 4 m × 6 m 24 m² | £58,500 – £71,000 | £68,500 – £86,000 | £83,000 – £110,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Somerset
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions people ask about orangery extensions
Do I need building regulations approval in Somerset?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does an orangery extension take to build in Somerset?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Will my neighbours in Somerset be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
How much does an orangery cost?
Our guide range is about £2,450 to £4,590 per m² including VAT, so a 16 m² standard-spec orangery is typically £45,500 to £57,500 in Somerset.
Book a free site visit in Somerset
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.