house-extension.uk

Extension plans and drawings in Staffordshire

We prepare extension plans and drawings for homes across Staffordshire, on their own or as the first stage of a full design and build project.

  • Guide priceFrom £1,150 inc VAT
  • PlanningWe find the right route for you
  • Towns covered13
  • Site visitFree, no obligation
Extension floor plans and elevations with a scale ruler and laser measure

When it helps

  • Projects that need a planning application or other approval
  • Anyone who wants fixed designs before getting build prices
  • Homeowners at the very start of a project

Fees in Staffordshire

Guide fees for Staffordshire including VAT, using our West Midlands factor of ×0.97. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialMeasured survey and planning drawings£1,150 – £2,150
StandardPlanning drawings plus building regulations drawings£2,100 – £3,700
PremiumFull pack with structural calculations and 3D visuals£3,250 – £5,350

For a figure based on your own dimensions, use our guide-price tool.

Working in Staffordshire

Towns we cover in Staffordshire include Stoke-on-Trent, Newcastle-under-Lyme, Burton upon Trent, Cannock, Tamworth, Stafford, Lichfield, Kidsgrove. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

Planning rules that apply in Staffordshire

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Staffordshire

Who do I contract with in Staffordshire?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do I need building regulations approval in Staffordshire?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does this take for a Staffordshire home?

2–6 weeks for drawings, depending on the council and the complexity of the project.

Can I use your drawings with another builder?

Yes. Once paid for, the drawings are yours to use for your project.

Do I need an architect?

Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.

Book a free site visit in Staffordshire

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote