Extension plans and drawings in Cheshire
We prepare extension plans and drawings for homes across Cheshire, on their own or as the first stage of a full design and build project.
- Guide priceFrom £1,100 inc VAT
- PlanningWe find the right route for you
- Towns covered11
- Site visitFree, no obligation

Towns in Cheshire
When it helps
- Anyone who wants fixed designs before getting build prices
- Projects that need a planning application or other approval
- Homeowners at the very start of a project
Fees in Cheshire
Guide fees for Cheshire including VAT, using our North West England factor of ×0.95. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,100 – £2,100 |
| Standard | Planning drawings plus building regulations drawings | £2,050 – £3,650 |
| Premium | Full pack with structural calculations and 3D visuals | £3,200 – £5,250 |
Try the guide-price tool to see a range for your own size and finish.
Covering Cheshire
Towns we cover in Cheshire include Warrington, Chester, Crewe, Ellesmere Port, Widnes, Runcorn, Macclesfield, Northwich. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
Planning and approvals in Cheshire
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Cheshire
How long does this take for a Cheshire home?
2–6 weeks for drawings, depending on the council and the complexity of the project.
Do you cover all of Cheshire?
Yes, across the whole of Cheshire. Site visits are free and there is no obligation.
Will my neighbours in Cheshire be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
How much do extension plans cost?
Our design packs range from about £1,100 to £5,250 including VAT, from planning drawings only to a full pack with building regulations drawings, structural calculations and 3D views. Council fees are separate.
Book a free site visit in Cheshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.