house-extension.uk

Building regulations for extensions across Maesteg

We prepare building regulations for extensions for homes in Maesteg, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in MaestegFrom £800 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsCF34
Builder installing a steel beam over a new rear opening on acrow props

When it helps

  • Every extension, whatever the planning route
  • Glass-heavy designs that need energy calculations
  • Homeowners using their own builder who need the drawings

Planning rules that apply in Maesteg

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

Local to Maesteg

Across CF34, we can visit, measure and advise. The same team covers Bridgend (8 miles), Tonypandy (9 miles), Porthcawl (9 miles), Rhondda (10 miles), all within easy reach.

Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.

Design and approval fees for Maesteg

These are guide fees for Maesteg, adjusted for Wales (×0.93) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£800 – £1,700
StandardDrawings plus structural calculations£1,200 – £2,450
PremiumComplex or two-storey pack with energy calculations£2,000 – £3,550

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Welsh Government.

For a figure based on your own dimensions, use our guide-price tool.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Maesteg home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions answered

How long does this take for a Maesteg home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Will my neighbours in Maesteg be involved?

If a planning application is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do you cover all of Maesteg?

Yes. We cover Maesteg and the surrounding parts of Mid Glamorgan. Site visits are free and there is no obligation.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in Maesteg

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote