Bedroom extensions across Maesteg
We design and build bedroom extensions for houses in Maesteg, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in MaestegFrom £24,000 inc VAT
- PlanningUsually a planning application
- Build time14–22 weeks on site
- Postcode districtsCF34

Planning and approvals in Maesteg
In Wales a rear extension of more than one storey can be permitted development only if the ground floor projects no more than 4 m, the upper floor no more than 3 m, it stays at least 10.5 m from the rear boundary and it is not in a conservation area, national park, National Landscape or World Heritage Site. Anything larger needs a planning application to the council.
In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
Guide prices for Maesteg
For Maesteg we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Maesteg: £1,490 to £2,980 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £24,000 – £29,500 | £24,000 – £31,500 | £26,500 – £36,000 |
| Bedroom and en-suite 18 m² | £26,500 – £33,000 | £31,500 – £41,500 | £40,000 – £54,000 |
| Two rooms 30 m² | £44,500 – £54,500 | £53,000 – £68,500 | £66,500 – £89,500 |
Try the guide-price tool to see a range for your own size and finish.
When a bedroom extension makes sense
- Homeowners who want an en-suite master bedroom
- Multi-generational households
- Growing families
New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.
Local to Maesteg
Postcode districts we cover around Maesteg include CF34. The same team covers Bridgend (8 miles), Tonypandy (9 miles), Porthcawl (9 miles), Rhondda (10 miles), all within easy reach.
Just over the West Glamorgan border, Briton Ferry is about 7 miles away. In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Maesteg home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about bedroom extensions
Do I need building regulations approval in Maesteg?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for a bedroom extension in Maesteg?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Maesteg, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Can I add a ground-floor bedroom for a relative?
Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.
Book a free site visit in Maesteg
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.