house-extension.uk

Building regulations for extensions across Bridgend

Need building regulations for extensions in Bridgend? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in BridgendFrom £800 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsCF31, CF35
Builder installing a steel beam over a new rear opening on acrow props

Covering Bridgend

Site visits are available across Bridgend (CF31, CF35). The same team covers Porthcawl (6 miles), Maesteg (8 miles), Tonypandy (10 miles), Rhondda (12 miles), all within easy reach.

For homes towards South Glamorgan, Cowbridge is around 6 miles away. In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.

Fees in Bridgend

Fees below are our Bridgend guide (×0.93, the Wales factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£800 – £1,700
StandardDrawings plus structural calculations£1,200 – £2,450
PremiumComplex or two-storey pack with energy calculations£2,000 – £3,550

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Welsh Government.

Want a range for your exact size? The guide-price tool takes about a minute.

When it helps

  • Homeowners using their own builder who need the drawings
  • Glass-heavy designs that need energy calculations
  • Every extension, whatever the planning route

Planning rules that apply in Bridgend

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Bridgend

Do I need building regulations approval in Bridgend?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Do you cover all of Bridgend?

Yes. We cover Bridgend and the surrounding parts of Mid Glamorgan. Site visits are free and there is no obligation.

Who do I contract with in Bridgend?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Bridgend

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote