Building regulations for extensions across Chalk Farm
We prepare building regulations for extensions for homes in Chalk Farm, as a stand-alone service or as the first stage of a design and build project.
- Guide price in Chalk FarmFrom £1,150 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsN1C, N7, NW1, NW3, NW5

Fees in Chalk Farm
These are guide fees for Chalk Farm, adjusted for London (×1.3) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,150 – £2,350 |
| Standard | Drawings plus structural calculations | £1,650 – £3,400 |
| Premium | Complex or two-storey pack with energy calculations | £2,850 – £4,950 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
What we take care of
- Structural calculations for beams, lintels and foundations
- Submission to the council or a registered building control approver
- Completion certificate on sign-off
- Inspection bookings throughout the build
- Building regulations drawings and written specification
Will the council need to approve it?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Chalk Farm
Postcode districts we cover around Chalk Farm include N1C, N7, NW1, NW3, NW5, NW8. We also work in nearby Camden Town (0 miles), Holloway (1 mile), Kilburn (2 miles), Highbury (2 miles).
Borehamwood, in Hertfordshire, is roughly 9 miles from Chalk Farm and also on our list. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Chalk Farm home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Chalk Farm
How long does this take for a Chalk Farm home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Do you cover all of Chalk Farm?
Yes. We cover Chalk Farm and the surrounding parts of Greater London. Site visits are free and there is no obligation.
Will my neighbours in Chalk Farm be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Chalk Farm
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.