Building regulations for extensions in Highbury
Need building regulations for extensions in Highbury? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in HighburyFrom £1,150 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsN1C, N1, N4, N5, N7

Local to Highbury
Our survey diary covers Highbury, including N1C, N1, N4, N5, N7, N16. The same team covers Holloway (1 mile), Stamford Hill (2 miles), Camden Town (2 miles), Chalk Farm (2 miles), all within easy reach.
London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Included in a typical project
- Energy and glazing checks, including whole-house calculations if needed
- Completion certificate on sign-off
- Structural calculations for beams, lintels and foundations
- Building regulations drawings and written specification
- Submission to the council or a registered building control approver
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
Fees in Highbury
Fees below are our Highbury guide (×1.3, the London factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,150 – £2,350 |
| Standard | Drawings plus structural calculations | £1,650 – £3,400 |
| Premium | Complex or two-storey pack with energy calculations | £2,850 – £4,950 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Highbury?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Highbury
Who do I contract with in Highbury?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Highbury, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does this take for a Highbury home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Highbury
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.