Building regulations for extensions in Cricklewood
For Cricklewood homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.
- Guide price in CricklewoodFrom £1,150 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsNW2, NW3, NW4, NW6, NW10

Covering Cricklewood
Our survey diary covers Cricklewood, including NW2, NW3, NW4, NW6, NW10, NW11. The same team covers Kilburn (1 mile), Golders Green (2 miles), Willesden (2 miles), Harlesden (2 miles), all within easy reach.
In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
Design and approval fees for Cricklewood
Guide fees for Cricklewood including VAT, using our London factor of ×1.3. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,150 – £2,350 |
| Standard | Drawings plus structural calculations | £1,650 – £3,400 |
| Premium | Complex or two-storey pack with energy calculations | £2,850 – £4,950 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Cricklewood
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Inspection bookings throughout the build
- Completion certificate on sign-off
- Structural calculations for beams, lintels and foundations
- Building regulations drawings and written specification
- Energy and glazing checks, including whole-house calculations if needed
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
Do you cover all of Cricklewood?
Yes. We cover Cricklewood and the surrounding parts of Greater London. Site visits are free and there is no obligation.
How long does this take for a Cricklewood home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Will my neighbours in Cricklewood be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Cricklewood
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.