Building regulations for extensions in Camden Town
Need building regulations for extensions in Camden Town? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in Camden TownFrom £1,150 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsN1C, NW1, NW3, NW5, NW8

Do I need planning permission in Camden Town?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Camden Town
We cover Camden Town and the postcode districts N1C, NW1, NW3, NW5, NW8, WC1H. We also work in nearby Chalk Farm (0 miles), Holloway (1 mile), Highbury (2 miles), Kilburn (2 miles).
London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Fees in Camden Town
These are guide fees for Camden Town, adjusted for London (×1.3) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,150 – £2,350 |
| Standard | Drawings plus structural calculations | £1,650 – £3,400 |
| Premium | Complex or two-storey pack with energy calculations | £2,850 – £4,950 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
What is included
- Inspection bookings throughout the build
- Submission to the council or a registered building control approver
- Structural calculations for beams, lintels and foundations
- Energy and glazing checks, including whole-house calculations if needed
- Building regulations drawings and written specification
- Completion certificate on sign-off
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
Will my neighbours in Camden Town be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Camden Town?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Camden Town, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Camden Town
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.