Bungalow extensions across Deal

A bungalow extension in Deal starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in DealFrom £29,000 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsCT14
Bungalow with a rear extension in matching brick and wide glazed doors

When a bungalow extension makes sense

  • Bungalows on larger plots
  • Families wanting more space on one floor
  • Homeowners planning for later life

How much does a bungalow extension cost in Deal?

Prices below are for Deal, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Deal: £1,960 to £3,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£29,000 – £35,500£34,000 – £45,000£43,500 – £57,500
4 m × 6 m
24 m²
£47,000 – £56,500£55,000 – £71,500£69,500 – £91,500
L-shape
35 m²
£68,500 – £82,500£80,000 – £104,000£101,500 – £133,500

For a figure based on your own dimensions, use our guide-price tool.

Covering Deal

Across CT14, we can visit, measure and advise. The same team covers Dover (8 miles), Ramsgate (8 miles), Broadstairs (9 miles), Margate (11 miles), all within easy reach.

For homes towards Essex, Southend-on-Sea is around 37 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.

Planning rules that apply in Deal

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Your questions about a bungalow extension in Deal

Who do I contract with for a bungalow extension in Deal?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours in Deal be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Deal?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Book a free site visit in Deal

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote