Single-storey rear extensions in Deal
Our design and build teams take on single-storey extensions in Deal, from the first measured survey through planning and building control to the finished room.
- Guide price in DealFrom £23,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsCT14

What we take care of
- Building regulations drawings and structural calculations
- Foundations, drainage and groundworks
- Measured survey and design
- Walls, steel beams and the new opening into the house
- Flat or pitched roof, rooflights or lantern
- Planning route checked and the right approval obtained
Single-storey extension prices in Deal
Prices below are for Deal, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Deal: £1,960 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £23,500 – £28,000 | £27,500 – £35,000 | £34,500 – £46,000 |
| 4 m × 5 m 20 m² | £39,000 – £46,000 | £45,500 – £58,500 | £58,000 – £76,500 |
| 5 m × 6 m 30 m² | £58,500 – £69,000 | £68,500 – £87,500 | £87,000 – £114,500 |
For a figure based on your own dimensions, use our guide-price tool.
Local to Deal
Across CT14, we can visit, measure and advise. Neighbouring towns we cover include Dover (8 miles), Ramsgate (8 miles), Broadstairs (9 miles), Margate (11 miles).
For homes towards Essex, Southend-on-Sea is around 37 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
Planning rules that apply in Deal
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Deal
Do I need building regulations approval in Deal?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Deal be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a single-storey extension in Deal?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Flat roof or pitched roof?
Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.
How deep can a single-storey rear extension be without planning permission?
In England, up to 3 m beyond the original rear wall on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Through the larger home extension prior approval scheme those depths rise to 6 m and 8 m. Wales, Scotland and Northern Ireland use their own rules, which we check for your address.
Book a free site visit in Deal
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.