Double-storey extensions in Deal: design, approvals and build
From the first sketch to final sign-off, we plan and build double-storey extensions in Deal and the surrounding Kent area.
- Guide price in DealFrom £42,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsCT14

Guide prices for Deal
Prices below are for Deal, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Deal: £1,740 to £3,360 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £42,500 – £51,000 | £48,000 – £63,500 | £61,500 – £81,000 |
| 4 m × 4 m, two floors 32 m² | £55,500 – £66,500 | £64,500 – £84,500 | £82,000 – £108,000 |
| 4 m × 6 m, two floors 48 m² | £83,000 – £99,500 | £96,500 – £126,500 | £123,500 – £161,500 |
Try the guide-price tool to see a range for your own size and finish.
Covering Deal
Our survey diary covers Deal, including CT14. Nearby, we also take on projects in Dover (8 miles), Ramsgate (8 miles), Broadstairs (9 miles), Margate (11 miles).
Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Planning and approvals in Deal
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Measured survey, design and planning drawings
- Insulation, plastering, electrics and plumbing to finish
- Foundations sized for two floors
- Building regulations drawings and structural design
The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Deal
Do I need building regulations approval in Deal?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a double-storey extension take to build in Deal?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Will my neighbours in Deal be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Book a free site visit in Deal
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end