Wraparound extensions in West Midlands
If you live in West Midlands and want more space without moving, a wraparound extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide priceFrom £34,500 inc VAT
- PlanningUsually a householder application
- Towns covered20
- Site visitFree, no obligation

Towns in West Midlands
How much does a wraparound extension cost in West Midlands?
Prices below are for West Midlands, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.
Typical rates in West Midlands: £1,940 to £3,590 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £34,500 – £42,000 | £40,000 – £51,000 | £50,500 – £65,000 |
| Medium L-shape 25 m² | £48,500 – £58,500 | £55,500 – £70,500 | £70,000 – £90,000 |
| Large L-shape 32 m² | £62,000 – £74,500 | £71,000 – £90,500 | £90,000 – £115,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
When a wraparound extension makes sense
- Families who want kitchen, dining and living in one space
- Terraced houses that want the largest ground floor possible
- Semi-detached houses with a side passage
Do I need planning permission in West Midlands?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around West Midlands
Towns we cover in West Midlands include Birmingham, Coventry, Wolverhampton, Dudley, Walsall, Solihull, Sutton Coldfield, West Bromwich. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in West Midlands
How long does a wraparound extension take to build in West Midlands?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Who do I contract with for a wraparound extension in West Midlands?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in West Midlands?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in West Midlands
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.