Wraparound extensions in Shirley
Our design and build teams take on wraparound extensions in Shirley, from the first measured survey through planning and building control to the finished room.
- Guide price in ShirleyFrom £34,500 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsB27, B28, B90, B91

What is included
- Party wall notice support (England and Wales)
- Survey, design and 3D layout options
- Full internal finish or kitchen-ready shell
- Roof with glazing along the side return
- Householder planning application
Local to Shirley
Across B27, B28, B90, B91, we can visit, measure and advise. Nearby, we also take on projects in Solihull (2 miles), Birmingham (6 miles), Smethwick (8 miles), Halesowen (10 miles).
The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
Guide prices for Shirley
These guide figures apply our West Midlands adjustment (×0.97) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Shirley: £1,940 to £3,590 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £34,500 – £42,000 | £40,000 – £51,000 | £50,500 – £65,000 |
| Medium L-shape 25 m² | £48,500 – £58,500 | £55,500 – £70,500 | £70,000 – £90,000 |
| Large L-shape 32 m² | £62,000 – £74,500 | £71,000 – £90,500 | £90,000 – £115,000 |
Try the guide-price tool to see a range for your own size and finish.
Will the council need to approve it?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Wraparound extension questions answered
Will my neighbours in Shirley be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does a wraparound extension take to build in Shirley?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do you cover all of Shirley?
Yes. We cover Shirley and the surrounding parts of West Midlands. Site visits are free and there is no obligation.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Shirley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.