Torquay wraparound extensions, designed and built
If you live in Torquay and want more space without moving, a wraparound extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in TorquayFrom £36,500 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsTQ1, TQ2, TQ3, TQ4

Included in a typical project
- Party wall notice support (England and Wales)
- Structural design for the corner and openings
- Householder planning application
- Full internal finish or kitchen-ready shell
- Foundations, drainage and any manhole relocation
Guide prices for Torquay
These guide figures apply our South West England adjustment (×1.02) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Torquay: £2,040 to £3,770 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £36,500 – £44,500 | £42,000 – £53,500 | £53,000 – £68,000 |
| Medium L-shape 25 m² | £51,000 – £61,500 | £58,500 – £74,000 | £73,500 – £94,500 |
| Large L-shape 32 m² | £65,000 – £78,500 | £75,000 – £95,000 | £94,500 – £121,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Do I need planning permission in Torquay?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
The planning position for a specific Torquay address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Torquay
Our survey diary covers Torquay, including TQ1, TQ2, TQ3, TQ4. Nearby, we also take on projects in Paignton (3 miles), Newton Abbot (6 miles), Exmouth (12 miles), Exeter (18 miles).
Bridport, in Dorset, is roughly 38 miles from Torquay and also on our list. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Torquay home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Torquay
Will my neighbours in Torquay be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Torquay, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Torquay?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Torquay
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.