Wraparound extensions in Plymouth
Planning a wraparound extension in Plymouth? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in PlymouthFrom £36,500 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsPL1, PL2, PL3, PL4, PL5

Do I need planning permission in Plymouth?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Plymouth
Postcode districts we cover around Plymouth include PL1, PL2, PL3, PL4, PL5, PL9. Nearby, we also take on projects in Paignton (26 miles), Newton Abbot (26 miles), Torquay (28 miles), Exeter (36 miles).
For homes towards Cornwall, Launceston is around 21 miles away. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Included in a typical project
- Foundations, drainage and any manhole relocation
- Party wall notice support (England and Wales)
- Full internal finish or kitchen-ready shell
- Structural design for the corner and openings
- Survey, design and 3D layout options
- Householder planning application
Guide prices for Plymouth
For Plymouth we adjust our national guide rates by ×1.02, the factor we use for South West England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Plymouth: £2,040 to £3,770 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £36,500 – £44,500 | £42,000 – £53,500 | £53,000 – £68,000 |
| Medium L-shape 25 m² | £51,000 – £61,500 | £58,500 – £74,000 | £73,500 – £94,500 |
| Large L-shape 32 m² | £65,000 – £78,500 | £75,000 – £95,000 | £94,500 – £121,000 |
For a figure based on your own dimensions, use our guide-price tool.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about wraparound extensions
Who do I contract with for a wraparound extension in Plymouth?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Plymouth be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Plymouth?
Yes. We cover Plymouth and the surrounding parts of Devon. Site visits are free and there is no obligation.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Book a free site visit in Plymouth
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.