house-extension.uk

Wraparound extensions across Horley

Thinking about a wraparound extension for your Horley home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in HorleyFrom £40,000 inc VAT
  • PlanningUsually a householder application
  • Build time14–20 weeks on site
  • Postcode districtsRH6
L-shaped wraparound extension on a brick terraced house at dusk

Extensions in and around Horley

Site visits are available across Horley (RH6). The same team covers Redhill (5 miles), Reigate (5 miles), Caterham (8 miles), Banstead (10 miles), all within easy reach.

For homes towards West Sussex, Crawley is around 4 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.

Wraparound extension prices in Horley

These guide figures apply our South East England adjustment (×1.12) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Horley: £2,240 to £4,140 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Compact L-shape
18 m²
£40,000 – £48,500£46,000 – £58,500£58,000 – £75,000
Medium L-shape
25 m²
£56,000 – £67,500£64,000 – £81,500£81,000 – £104,000
Large L-shape
32 m²
£71,500 – £86,500£82,000 – £104,000£103,500 – £133,000

Want a range for your exact size? The guide-price tool takes about a minute.

Included in a typical project

  • Householder planning application
  • Party wall notice support (England and Wales)
  • Structural design for the corner and openings
  • Full internal finish or kitchen-ready shell

Will the council need to approve it?

In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Wraparound extension questions answered

Do I need building regulations approval in Horley?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will my neighbours in Horley be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a wraparound extension take to build in Horley?

On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Do wraparound extensions need planning permission?

Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.

Is a wraparound better than a side return alone?

It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.

Book a free site visit in Horley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote