Orangery extensions in Horley
Thinking about an orangery extension for your Horley home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in HorleyFrom £33,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsRH6

What we take care of
- Thermal calculations where glazing is generous
- Design of piers, roof perimeter and lantern proportions
- Opening into the main house
- Heating sized for the glass area
- Foundations, walls and insulated perimeter roof
- Aluminium or timber lantern and full-height glazing
What should I budget for an orangery extension in Horley?
For Horley we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Horley: £2,690 to £5,040 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £33,500 – £41,000 | £37,500 – £47,500 | £45,500 – £60,500 |
| 4 m × 4 m 16 m² | £43,000 – £52,000 | £50,000 – £63,000 | £60,500 – £81,000 |
| 4 m × 6 m 24 m² | £64,500 – £78,000 | £75,000 – £94,500 | £91,000 – £121,000 |
Try the guide-price tool to see a range for your own size and finish.
Planning rules that apply in Horley
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Local to Horley
Across RH6, we can visit, measure and advise. The same team covers Redhill (5 miles), Reigate (5 miles), Caterham (8 miles), Banstead (10 miles), all within easy reach.
For homes towards West Sussex, Crawley is around 4 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Orangery extension questions answered
How long does an orangery extension take to build in Horley?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do I need building regulations approval in Horley?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Horley be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How much does an orangery cost?
Our guide range is about £2,690 to £5,040 per m² including VAT, so a 16 m² standard-spec orangery is typically £50,000 to £63,000 in Horley.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Book a free site visit in Horley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.