Utility and boot room extensions in March
Our design and build teams take on utility room extensions in March, from the first measured survey through planning and building control to the finished room.
- Guide price in MarchFrom £14,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsPE15

When a utility room extension makes sense
- Houses with a side passage or small rear corner
- Busy family homes
- Kitchens that have run out of space for appliances
Utility room extension prices in March
For March we adjust our national guide rates by ×1.06, the factor we use for East of England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in March: £2,010 to £3,710 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £14,500 – £18,000 | £14,500 – £18,500 | £14,500 – £19,000 |
| 2.5 m × 3.2 m 8 m² | £16,000 – £19,500 | £19,000 – £24,000 | £23,500 – £30,000 |
| 3 m × 3.6 m 11 m² | £22,000 – £26,500 | £26,000 – £33,000 | £32,500 – £41,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Covering March
Our survey diary covers March, including PE15. The same team covers Wisbech (8 miles), Ely (13 miles), Peterborough (14 miles), Huntingdon (19 miles), all within easy reach.
Just over the Norfolk border, King's Lynn is about 19 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Planning rules that apply in March
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your March home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a utility room extension in March
Do I need building regulations approval in March?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a utility room extension take to build in March?
On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for March, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Book a free site visit in March
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end