Pitched roof extensions in March: design, approvals and build
March homeowners can use us for the whole pitched roof extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in MarchFrom £23,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsPE15

What should I budget for a pitched roof extension in March?
Prices below are for March, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.
Typical rates in March: £1,960 to £3,710 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £23,500 – £27,500 | £27,000 – £35,000 | £34,500 – £45,000 |
| 4 m × 5 m 20 m² | £39,000 – £46,000 | £45,500 – £58,500 | £58,000 – £74,500 |
| 5 m × 6 m 30 m² | £58,500 – £68,500 | £68,000 – £87,500 | £87,000 – £111,500 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in March?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in March
Our survey diary covers March, including PE15. The same team covers Wisbech (8 miles), Ely (13 miles), Peterborough (14 miles), Huntingdon (19 miles), all within easy reach.
For homes towards Norfolk, King's Lynn is around 19 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Is a pitched roof extension right for your house?
- Traditional, period and rural houses
- Homeowners who prefer a vaulted ceiling
- Conservation-sensitive streets
Matching tiles is harder than it sounds. We source reclaimed or closest-match tiles where the originals are no longer made and agree samples with you before ordering.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your March home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Pitched roof extension questions answered
How long does a pitched roof extension take to build in March?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do I need building regulations approval in March?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for March, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Is a pitched roof better than a flat roof?
Neither is better in all cases. Pitched roofs blend with traditional houses and shed water quickly; flat roofs give more headroom and suit modern designs and lanterns.
Can I have a vaulted ceiling?
Yes. A vaulted ceiling with roof windows is one of the main reasons to choose a pitched roof. It needs insulation between and under the rafters to meet the building regulations.
Book a free site visit in March
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end