Side extensions across March
If you live in March and want more space without moving, a side extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in MarchFrom £23,000 inc VAT
- PlanningSingle storey can be permitted development
- Build time10–18 weeks on site
- Postcode districtsPE15

What is included
- Windows, doors and finishes to match
- Foundations near boundaries and any drains
- Survey, design and street-view drawings
- Planning route checked or application made
Councils often prefer side extensions to sit slightly back from the front of the house with a lower roof, so the original building still reads clearly. We design to those principles from the start to avoid redesigns.
Guide prices for March
Labour and material costs vary across the UK, so for March we use our East of England factor (×1.06). The ranges include VAT and exclude design, structural and council fees.
Typical rates in March: £1,860 to £3,600 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2.5 m × 5 m 12 m² | £23,000 – £28,000 | £26,000 – £34,000 | £33,000 – £43,500 |
| 3 m × 6 m 18 m² | £33,000 – £40,500 | £39,000 – £51,000 | £49,500 – £65,000 |
| 3 m × 8 m 24 m² | £44,500 – £53,500 | £52,000 – £67,500 | £66,000 – £86,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in March
We cover March and the postcode districts PE15. The same team covers Wisbech (8 miles), Ely (13 miles), Peterborough (14 miles), Huntingdon (19 miles), all within easy reach.
King's Lynn, in Norfolk, is roughly 19 miles from March and also on our list. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Will the council need to approve it?
In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a side extension in March
How long does a side extension take to build in March?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Will my neighbours in March be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for March, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How much does a side extension cost?
Our guide range is about £1,860 to £3,600 per m² including VAT, depending on specification, so a standard 18 m² single-storey side extension lands around £39,000 to £51,000 in March.
Can I build a side extension without planning permission?
In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a planning application.
Book a free site visit in March
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.