Utility and boot room extensions across Heywood
Our design and build teams take on utility room extensions in Heywood, from the first measured survey through planning and building control to the finished room.
- Guide price in HeywoodFrom £13,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsOL10, OL11

Guide prices for Heywood
Labour and material costs vary across the UK, so for Heywood we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Heywood: £1,800 to £3,320 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £13,000 – £16,000 | £13,000 – £17,000 | £13,000 – £17,000 |
| 2.5 m × 3.2 m 8 m² | £14,000 – £17,500 | £17,000 – £21,500 | £21,000 – £27,000 |
| 3 m × 3.6 m 11 m² | £19,500 – £24,000 | £23,500 – £29,500 | £29,000 – £37,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Do I need planning permission in Heywood?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Is a utility room extension right for your house?
- Busy family homes
- Houses with a side passage or small rear corner
- Kitchens that have run out of space for appliances
A good utility works like a back-of-house corridor: in from the garden, boots off, coats on hooks, washing on the way through. We plan the door positions so it doesn't become another room to walk around.
Working in Heywood
Postcode districts we cover around Heywood include OL10, OL11. The same team covers Middleton (3 miles), Rochdale (3 miles), Bury (3 miles), Royton (4 miles), all within easy reach.
For homes towards Lancashire, Rawtenstall is around 8 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Utility room extension questions answered
Do you cover all of Heywood?
Yes. We cover Heywood and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.
How long does a utility room extension take to build in Heywood?
On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Do I need building regulations approval in Heywood?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Book a free site visit in Heywood
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end