Extension plans and drawings across Heywood
For Heywood homeowners we handle extension plans and drawings, with fees agreed in writing before any work starts.
- Guide price in HeywoodFrom £1,100 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsOL10, OL11

Who this service is for
- Anyone who wants fixed designs before getting build prices
- Projects that need a planning application or other approval
- Homeowners at the very start of a project
The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.
Do I need planning permission in Heywood?
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
The planning position for a specific Heywood address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Fees in Heywood
Fees below are our Heywood guide (×0.95, the North West England factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,100 – £2,100 |
| Standard | Planning drawings plus building regulations drawings | £2,050 – £3,650 |
| Premium | Full pack with structural calculations and 3D visuals | £3,200 – £5,250 |
Want a range for your exact size? The guide-price tool takes about a minute.
Covering Heywood
Our survey diary covers Heywood, including OL10, OL11. Neighbouring towns we cover include Middleton (3 miles), Rochdale (3 miles), Bury (3 miles), Royton (4 miles).
The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Heywood
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Heywood, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Heywood?
Yes. We cover Heywood and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.
Do I need building regulations approval in Heywood?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do I need an architect?
Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
Book a free site visit in Heywood
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.