Utility and boot room extensions in Essex
Essex homeowners can use us for the whole utility room extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide priceFrom £14,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Towns covered21
- Site visitFree, no obligation

Towns in Essex
Working in Essex
Towns we cover in Essex include Southend-on-Sea, Basildon, Colchester, Chelmsford, Harlow, Grays, Braintree, Brentwood. The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
How much does a utility room extension cost in Essex?
Prices below are for Essex, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Essex: £2,010 to £3,710 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £14,500 – £18,000 | £14,500 – £18,500 | £14,500 – £19,000 |
| 2.5 m × 3.2 m 8 m² | £16,000 – £19,500 | £19,000 – £24,000 | £23,500 – £30,000 |
| 3 m × 3.6 m 11 m² | £22,000 – £26,500 | £26,000 – £33,000 | £32,500 – £41,000 |
Try the guide-price tool to see a range for your own size and finish.
What is included
- Ventilation for a tumble dryer
- Design around appliances, sink and storage
- Back door and a hard-wearing floor
- Waste and water connections
- Built-in storage or space ready for your units
Do I need planning permission in Essex?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Utility room extension questions answered
How long does a utility room extension take to build in Essex?
On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Will my neighbours in Essex be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Essex?
Yes, across the whole of Essex. Site visits are free and there is no obligation.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Book a free site visit in Essex
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.