house-extension.uk

Grays utility room extensions, designed and built

Our design and build teams take on utility room extensions in Grays, from the first measured survey through planning and building control to the finished room.

  • Guide price in GraysFrom £14,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsRM15, RM16, RM17, RM18, RM20
Utility and boot room with stacked washer and dryer, bench and coat hooks

Covering Grays

Postcode districts we cover around Grays include RM15, RM16, RM17, RM18, RM20. Neighbouring towns we cover include South Ockendon (3 miles), Stanford-le-Hope (6 miles), Basildon (9 miles), Brentwood (10 miles).

Gravesend, in Kent, is roughly 3 miles from Grays and also on our list. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

Included in a typical project

  • Design around appliances, sink and storage
  • Back door and a hard-wearing floor
  • Waste and water connections
  • Ventilation for a tumble dryer
  • Built-in storage or space ready for your units

What should I budget for a utility room extension in Grays?

These guide figures apply our East of England adjustment (×1.06) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Grays: £2,010 to £3,710 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£14,500 – £18,000£14,500 – £18,500£14,500 – £19,000
2.5 m × 3.2 m
8 m²
£16,000 – £19,500£19,000 – £24,000£23,500 – £30,000
3 m × 3.6 m
11 m²
£22,000 – £26,500£26,000 – £33,000£32,500 – £41,000

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Grays?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

The planning position for a specific Grays address depends on its history and any designations, which is why we check it at the first visit.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Grays

Do you cover all of Grays?

Yes. We cover Grays and the surrounding parts of Essex. Site visits are free and there is no obligation.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Grays, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Will my neighbours in Grays be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Book a free site visit in Grays

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote