house-extension.uk

Harlow utility room extensions, designed and built

From the first sketch to final sign-off, we plan and build utility room extensions in Harlow and the surrounding Essex area.

  • Guide price in HarlowFrom £14,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsCM17, CM18, CM19, CM20
Utility and boot room with stacked washer and dryer, bench and coat hooks

Extensions in and around Harlow

Across CM17, CM18, CM19, CM20, we can visit, measure and advise. We also work in nearby Waltham Abbey (8 miles), Brentwood (14 miles), Chelmsford (16 miles), Billericay (17 miles).

Just over the Hertfordshire border, Hoddesdon is about 5 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

What should I budget for a utility room extension in Harlow?

Labour and material costs vary across the UK, so for Harlow we use our East of England factor (×1.06). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Harlow: £2,010 to £3,710 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£14,500 – £18,000£14,500 – £18,500£14,500 – £19,000
2.5 m × 3.2 m
8 m²
£16,000 – £19,500£19,000 – £24,000£23,500 – £30,000
3 m × 3.6 m
11 m²
£22,000 – £26,500£26,000 – £33,000£32,500 – £41,000

For a figure based on your own dimensions, use our guide-price tool.

What we take care of

  • Built-in storage or space ready for your units
  • Ventilation for a tumble dryer
  • Design around appliances, sink and storage
  • Waste and water connections
  • Back door and a hard-wearing floor

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Your questions about a utility room extension in Harlow

Do I need building regulations approval in Harlow?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for a utility room extension in Harlow?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a utility room extension take to build in Harlow?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Book a free site visit in Harlow

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote