Utility and boot room extensions in East Molesey
If you live in East Molesey and want more space without moving, a utility room extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in East MoleseyFrom £15,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsKT7, KT8

Utility room extension prices in East Molesey
For East Molesey we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in East Molesey: £2,130 to £3,920 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £15,500 – £19,000 | £15,500 – £20,000 | £15,500 – £20,000 |
| 2.5 m × 3.2 m 8 m² | £17,000 – £20,500 | £20,000 – £25,500 | £25,000 – £31,500 |
| 3 m × 3.6 m 11 m² | £23,000 – £28,000 | £27,500 – £34,500 | £34,000 – £43,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in East Molesey
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific East Molesey address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Included in a typical project
- Waste and water connections
- Built-in storage or space ready for your units
- Design around appliances, sink and storage
- Ventilation for a tumble dryer
Extensions in and around East Molesey
Postcode districts we cover around East Molesey include KT7, KT8. Neighbouring towns we cover include West Molesey (1 mile), Esher (2 miles), Walton-on-Thames (3 miles), Sunbury-on-Thames (3 miles).
In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in East Molesey
Do you cover all of East Molesey?
Yes. We cover East Molesey and the surrounding parts of Surrey. Site visits are free and there is no obligation.
Who do I contract with for a utility room extension in East Molesey?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a utility room extension take to build in East Molesey?
On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
How much does a utility room extension cost?
Our guide range is about £2,130 to £3,920 per m² including VAT, with a minimum of around £16,000. An 8 m² standard-spec utility is typically £20,000 to £25,500 in East Molesey.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Book a free site visit in East Molesey
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.