house-extension.uk

Extension plans and drawings across East Molesey

Need extension plans and drawings in East Molesey? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in East MoleseyFrom £1,300 inc VAT
  • PlanningWe find the right route for you
  • Timescale2–6 weeks for drawings
  • Postcode districtsKT7, KT8
Extension floor plans and elevations with a scale ruler and laser measure

Will the council need to approve it?

In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Working in East Molesey

Our survey diary covers East Molesey, including KT7, KT8. Neighbouring towns we cover include West Molesey (1 mile), Esher (2 miles), Walton-on-Thames (3 miles), Sunbury-on-Thames (3 miles).

Hampton, in Greater London, is roughly 1 mile from East Molesey and also on our list. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

What is included

  • Two or three layout options to compare
  • 3D views to check the look and the light (full pack)
  • Planning drawings: existing and proposed plans and elevations, site and location plans
  • Structural calculations from an engineer (full pack)
  • Building regulations drawings and specification
  • Measured survey of the house and garden

The most expensive changes are the ones made after the steel is ordered. A good design stage settles layout, heights, glazing and services on paper, so the build price is firm.

What it costs in East Molesey

Fees below are our East Molesey guide (×1.12, the South East England factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialMeasured survey and planning drawings£1,300 – £2,500
StandardPlanning drawings plus building regulations drawings£2,450 – £4,300
PremiumFull pack with structural calculations and 3D visuals£3,800 – £6,200

Try the guide-price tool to see a range for your own size and finish.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in East Molesey

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for East Molesey, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does this take for a East Molesey home?

2–6 weeks for drawings, depending on the council and the complexity of the project.

Do you cover all of East Molesey?

Yes. We cover East Molesey and the surrounding parts of Surrey. Site visits are free and there is no obligation.

Can I use your drawings with another builder?

Yes. Once paid for, the drawings are yours to use for your project.

Do I need an architect?

Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.

Book a free site visit in East Molesey

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote