Utility and boot room extensions for homes in Chatham
Chatham homeowners can use us for the whole utility room extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in ChathamFrom £15,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsME1, ME2, ME4, ME5, ME7

What is included
- Design around appliances, sink and storage
- Back door and a hard-wearing floor
- Built-in storage or space ready for your units
- Waste and water connections
- Ventilation for a tumble dryer
Working in Chatham
Across ME1, ME2, ME4, ME5, ME7, ME8, we can visit, measure and advise. We also work in nearby Rochester (1 mile), Gillingham (1 mile), Strood (2 miles), Maidstone (8 miles).
Just over the Essex border, Canvey Island is about 10 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Guide prices for Chatham
Labour and material costs vary across the UK, so for Chatham we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Chatham: £2,130 to £3,920 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £15,500 – £19,000 | £15,500 – £20,000 | £15,500 – £20,000 |
| 2.5 m × 3.2 m 8 m² | £17,000 – £20,500 | £20,000 – £25,500 | £25,000 – £31,500 |
| 3 m × 3.6 m 11 m² | £23,000 – £28,000 | £27,500 – £34,500 | £34,000 – £43,500 |
For a figure based on your own dimensions, use our guide-price tool.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Chatham
How long does a utility room extension take to build in Chatham?
On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Will my neighbours in Chatham be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Chatham?
Yes. We cover Chatham and the surrounding parts of Kent. Site visits are free and there is no obligation.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Book a free site visit in Chatham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.