Orangery extensions for homes in Chatham
A orangery extension in Chatham starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in ChathamFrom £33,500 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsME1, ME2, ME4, ME5, ME7

When an orangery extension makes sense
- Period and detached houses with a garden view
- Those who want daylight without overheating
- Homeowners replacing an older conservatory
Working in Chatham
Postcode districts we cover around Chatham include ME1, ME2, ME4, ME5, ME7, ME8. We also work in nearby Rochester (1 mile), Gillingham (1 mile), Strood (2 miles), Maidstone (8 miles).
Just over the Essex border, Canvey Island is about 10 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
How much does an orangery extension cost in Chatham?
Prices below are for Chatham, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Chatham: £2,690 to £5,040 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £33,500 – £41,000 | £37,500 – £47,500 | £45,500 – £60,500 |
| 4 m × 4 m 16 m² | £43,000 – £52,000 | £50,000 – £63,000 | £60,500 – £81,000 |
| 4 m × 6 m 24 m² | £64,500 – £78,000 | £75,000 – £94,500 | £91,000 – £121,000 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Chatham
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about orangery extensions
Do you cover all of Chatham?
Yes. We cover Chatham and the surrounding parts of Kent. Site visits are free and there is no obligation.
How long does an orangery extension take to build in Chatham?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Who do I contract with for an orangery extension in Chatham?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Book a free site visit in Chatham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.