house-extension.uk

Strood utility room extensions, designed and built

If you live in Strood and want more space without moving, a utility room extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in StroodFrom £15,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsME1, ME2, ME4
Utility and boot room with stacked washer and dryer, bench and coat hooks

Planning rules that apply in Strood

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering Strood

Site visits are available across Strood (ME1, ME2, ME4). We also work in nearby Rochester (1 mile), Chatham (2 miles), Gillingham (3 miles), Gravesend (6 miles).

Just over the Essex border, Grays is about 9 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

How much does a utility room extension cost in Strood?

These guide figures apply our South East England adjustment (×1.12) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Strood: £2,130 to £3,920 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£15,500 – £19,000£15,500 – £20,000£15,500 – £20,000
2.5 m × 3.2 m
8 m²
£17,000 – £20,500£20,000 – £25,500£25,000 – £31,500
3 m × 3.6 m
11 m²
£23,000 – £28,000£27,500 – £34,500£34,000 – £43,500

Try the guide-price tool to see a range for your own size and finish.

Is a utility room extension right for your house?

  • Kitchens that have run out of space for appliances
  • Busy family homes
  • Houses with a side passage or small rear corner

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about utility room extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Strood, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a utility room extension take to build in Strood?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Do I need building regulations approval in Strood?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Book a free site visit in Strood

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote