Utility and boot room extensions across Chalk Farm
A utility room extension in Chalk Farm starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in Chalk FarmFrom £18,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsN1C, N7, NW1, NW3, NW5

Included in a typical project
- Ventilation for a tumble dryer
- Back door and a hard-wearing floor
- Design around appliances, sink and storage
- Built-in storage or space ready for your units
- Waste and water connections
Utility room extension prices in Chalk Farm
Labour and material costs vary across the UK, so for Chalk Farm we use our London factor (×1.3). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Chalk Farm: £2,470 to £4,550 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £18,000 – £22,000 | £18,000 – £23,000 | £18,000 – £23,000 |
| 2.5 m × 3.2 m 8 m² | £19,500 – £23,500 | £23,000 – £29,500 | £29,000 – £36,500 |
| 3 m × 3.6 m 11 m² | £27,000 – £32,500 | £32,000 – £40,500 | £40,000 – £50,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Chalk Farm
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Chalk Farm
Site visits are available across Chalk Farm (N1C, N7, NW1, NW3, NW5, NW8). Nearby, we also take on projects in Camden Town (0 miles), Holloway (1 mile), Kilburn (2 miles), Highbury (2 miles).
For homes towards Hertfordshire, Borehamwood is around 9 miles away. London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about utility room extensions
Do I need building regulations approval in Chalk Farm?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Chalk Farm?
Yes. We cover Chalk Farm and the surrounding parts of Greater London. Site visits are free and there is no obligation.
Who do I contract with for a utility room extension in Chalk Farm?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Book a free site visit in Chalk Farm
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.