Double-storey extensions across Chalk Farm
Chalk Farm homeowners can use us for the whole double-storey extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in Chalk FarmFrom £49,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsN1C, N7, NW1, NW3, NW5

Extensions in and around Chalk Farm
Across N1C, N7, NW1, NW3, NW5, NW8, we can visit, measure and advise. Neighbouring towns we cover include Camden Town (0 miles), Holloway (1 mile), Kilburn (2 miles), Highbury (2 miles).
Just over the Hertfordshire border, Borehamwood is about 9 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Is a double-storey extension right for your house?
- Homeowners who would otherwise consider moving
- Growing families who need a bedroom as well as a bigger kitchen
- Houses with enough distance to the rear or side boundary
Double-storey extension prices in Chalk Farm
For Chalk Farm we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Chalk Farm: £2,020 to £3,900 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £49,000 – £59,000 | £56,000 – £73,500 | £71,500 – £94,000 |
| 4 m × 4 m, two floors 32 m² | £64,000 – £77,000 | £74,500 – £98,000 | £95,500 – £125,000 |
| 4 m × 6 m, two floors 48 m² | £96,500 – £115,500 | £112,000 – £147,000 | £143,500 – £187,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Chalk Farm
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about double-storey extensions
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Chalk Farm, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Chalk Farm?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a double-storey extension take to build in Chalk Farm?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £2,020 to £3,900 per m² of new floor area including VAT, compared with £2,280 to £4,420 per m² for single-storey work, because the foundations and roof are shared across two floors.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Chalk Farm
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.