Timber frame extensions in Uppingham: design, approvals and build
A timber frame extension in Uppingham starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in UppinghamFrom £19,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsLE15

Extensions in and around Uppingham
Site visits are available across Uppingham (LE15). Nearby, we also take on projects in Oakham (0 miles).
Stamford, in Lincolnshire, is roughly 9 miles from Uppingham and also on our list. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
Guide prices for Uppingham
Prices below are for Uppingham, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Uppingham: £1,660 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £24,000 | £23,000 – £30,500 | £29,500 – £39,000 |
| 4 m × 5 m 20 m² | £33,000 – £40,000 | £38,500 – £50,500 | £49,000 – £65,000 |
| 5 m × 6 m 30 m² | £49,500 – £60,000 | £58,000 – £76,000 | £74,000 – £97,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Do I need planning permission in Uppingham?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What we take care of
- Cladding, render or brick slip finish
- Foundations, often lighter than masonry
- Fire and acoustic details where needed
- Breathable wall build-up with insulation
- Frame design and structural calculations
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a timber frame extension in Uppingham
How long does a timber frame extension take to build in Uppingham?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in Uppingham?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for a timber frame extension in Uppingham?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,660 to £3,230 per m² including VAT.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Book a free site visit in Uppingham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.