Planning a bungalow extension in Uppingham? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in UppinghamFrom £24,500 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsLE15
Bungalow with a rear extension in matching brick and wide glazed doors

What should I budget for a bungalow extension in Uppingham?

Prices below are for Uppingham, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Uppingham: £1,660 to £3,230 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£24,500 – £30,000£29,000 – £38,000£37,000 – £48,500
4 m × 6 m
24 m²
£39,500 – £48,000£46,500 – £60,500£59,000 – £78,000
L-shape
35 m²
£58,000 – £70,000£68,000 – £88,500£86,000 – £113,500

For a figure based on your own dimensions, use our guide-price tool.

What is included

  • Level thresholds and accessible layouts
  • Roof designs that tie into the existing hipped or gable roof
  • Structural survey before any upward extension
  • Planning application where needed
  • Single-storey extension options assessed first

Do I need planning permission in Uppingham?

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Working in Uppingham

Postcode districts we cover around Uppingham include LE15. The same team covers Oakham (0 miles), all within easy reach.

Just over the Lincolnshire border, Stamford is about 9 miles away. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Your questions about a bungalow extension in Uppingham

Who do I contract with for a bungalow extension in Uppingham?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a bungalow extension take to build in Uppingham?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Will my neighbours in Uppingham be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Book a free site visit in Uppingham

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.