house-extension.uk

Felixstowe timber frame extensions, designed and built

Our design and build teams take on timber frame extensions in Felixstowe, from the first measured survey through planning and building control to the finished room.

  • Guide price in FelixstoweFrom £22,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time8–14 weeks on site
  • Postcode districtsIP11
Timber frame extension under construction with OSB sheathing and roof joists

Working in Felixstowe

Across IP11, we can visit, measure and advise. Neighbouring towns we cover include Woodbridge (9 miles), Ipswich (11 miles), Stowmarket (22 miles), Sudbury (27 miles).

The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.

Guide prices for Felixstowe

For Felixstowe we adjust our national guide rates by ×1.06, the factor we use for East of England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Felixstowe: £1,860 to £3,600 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£22,000 – £27,000£26,000 – £34,000£33,000 – £43,500
4 m × 5 m
20 m²
£37,000 – £45,000£43,000 – £56,500£55,000 – £72,500
5 m × 6 m
30 m²
£55,500 – £67,000£65,000 – £84,500£82,500 – £108,500

Want a range for your exact size? The guide-price tool takes about a minute.

Planning rules that apply in Felixstowe

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • Foundations, often lighter than masonry
  • Breathable wall build-up with insulation
  • Fire and acoustic details where needed
  • Cladding, render or brick slip finish
  • Frame design and structural calculations

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Timber frame extension questions answered

How long does a timber frame extension take to build in Felixstowe?

On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Do you cover all of Felixstowe?

Yes. We cover Felixstowe and the surrounding parts of Suffolk. Site visits are free and there is no obligation.

Who do I contract with for a timber frame extension in Felixstowe?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Does a timber frame extension need planning permission?

The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.

Is timber frame cheaper than brick?

It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,860 to £3,600 per m² including VAT.

Book a free site visit in Felixstowe

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote