Ipswich timber frame extensions, designed and built
Ipswich homeowners can use us for the whole timber frame extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in IpswichFrom £22,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsIP1, IP2, IP3, IP4, IP5

Included in a typical project
- Foundations, often lighter than masonry
- Fire and acoustic details where needed
- Breathable wall build-up with insulation
- Frame design and structural calculations
- Cladding, render or brick slip finish
Covering Ipswich
Site visits are available across Ipswich (IP1, IP2, IP3, IP4, IP5, IP8). Nearby, we also take on projects in Woodbridge (10 miles), Felixstowe (11 miles), Stowmarket (11 miles), Sudbury (18 miles).
Harwich, in Essex, is roughly 10 miles from Ipswich and also on our list. The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
Planning rules that apply in Ipswich
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Ipswich address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What should I budget for a timber frame extension in Ipswich?
Prices below are for Ipswich, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Ipswich: £1,860 to £3,600 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £22,000 – £27,000 | £26,000 – £34,000 | £33,000 – £43,500 |
| 4 m × 5 m 20 m² | £37,000 – £45,000 | £43,000 – £56,500 | £55,000 – £72,500 |
| 5 m × 6 m 30 m² | £55,500 – £67,000 | £65,000 – £84,500 | £82,500 – £108,500 |
Try the guide-price tool to see a range for your own size and finish.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Ipswich
Who do I contract with for a timber frame extension in Ipswich?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a timber frame extension take to build in Ipswich?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Will my neighbours in Ipswich be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,860 to £3,600 per m² including VAT.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Book a free site visit in Ipswich
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end