Single-storey rear extensions for homes in Tipton
A single-storey extension in Tipton starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in TiptonFrom £20,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsB69, DY1, DY2, DY3, DY4

Who a single-storey extension suits
- Terraced houses that want a deeper kitchen across the full width
- Semi-detached and detached houses with a usable rear garden
- Homeowners who want open-plan living onto the garden
Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.
Single-storey extension prices in Tipton
These guide figures apply our West Midlands adjustment (×0.97) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Tipton: £1,700 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,000 – £24,000 | £23,500 – £30,500 | £30,000 – £40,000 |
| 4 m × 5 m 20 m² | £33,500 – £40,000 | £39,500 – £50,500 | £50,000 – £66,000 |
| 5 m × 6 m 30 m² | £50,500 – £60,000 | £59,500 – £76,000 | £75,500 – £99,000 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Tipton?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Tipton
Site visits are available across Tipton (B69, DY1, DY2, DY3, DY4, WV14). We also work in nearby Dudley (2 miles), Wednesbury (2 miles), West Bromwich (3 miles), Willenhall (4 miles).
Just over the Staffordshire border, Great Wyrley is about 10 miles away. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Tipton
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Tipton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a single-storey extension take to build in Tipton?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do you cover all of Tipton?
Yes. We cover Tipton and the surrounding parts of West Midlands. Site visits are free and there is no obligation.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Will I need a steel beam?
Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.
Book a free site visit in Tipton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.