house-extension.uk

Side extensions for homes in Tipton

If you live in Tipton and want more space without moving, a side extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in TiptonFrom £21,000 inc VAT
  • PlanningSingle storey can be permitted development
  • Build time10–18 weeks on site
  • Postcode districtsB69, DY1, DY2, DY3, DY4
Single-storey side extension with a gable roof beside a block-paved drive

When a side extension makes sense

  • Homes needing a utility, study or ground-floor bedroom
  • Detached and semi-detached houses with side land
  • Houses where the rear garden is small

How much does a side extension cost in Tipton?

For Tipton we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Tipton: £1,700 to £3,300 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2.5 m × 5 m
12 m²
£21,000 – £26,000£23,500 – £31,000£30,000 – £40,000
3 m × 6 m
18 m²
£30,500 – £37,000£35,500 – £46,500£45,000 – £59,500
3 m × 8 m
24 m²
£40,500 – £49,000£47,500 – £62,000£60,500 – £79,500

Want a range for your exact size? The guide-price tool takes about a minute.

Will the council need to approve it?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering Tipton

Across B69, DY1, DY2, DY3, DY4, WV14, we can visit, measure and advise. We also work in nearby Dudley (2 miles), Wednesbury (2 miles), West Bromwich (3 miles), Willenhall (4 miles).

For homes towards Staffordshire, Great Wyrley is around 10 miles away. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Tipton home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about side extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Tipton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do you cover all of Tipton?

Yes. We cover Tipton and the surrounding parts of West Midlands. Site visits are free and there is no obligation.

Who do I contract with for a side extension in Tipton?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I build a side extension without planning permission?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a planning application.

Can I build over my driveway?

Yes, if the foundations work and you keep any parking the council requires. Drains and services under drives are common, so we check before design.

Book a free site visit in Tipton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote